Simulated spectrum peak wave period (3-hourly, 150a) from FIO-ESM v2.0 abrupt-4xCO2 experiment r1i1p1f1

2020 
Simulated spectrum peak wave period (3-hourly, 150a) from FIO-ESM v2.0 abrupt-4xCO2 experiment (CO2 abruptly quadrupled and then held constant) r1i1p1f1, which is branch from Jan 1, 301 of piControl experiment. The grid, named gx1v6, is the displaced pole (the North Pole displaced to the Greenland) grid with 1.1 degree in longitude and 0.27-0.54 degree in latitude.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []