The Improvement in the Arrangement of Centralized Sealing-tape Machine Lane

2013 
In order to raise the mechanization level of coal mines,Shanxi Hongxiang Coal Limited Company makes the two original laneway into the single laneway which has a total length of 992 meters through improving the arrangement of centralized sealing-tape machine lane,and changes the original tape transport into the combination by one laneway made of the tape transport and the overhead manned equipment,which realizes that this mine could be able to transport coal throuth the longest tape laneway by the single tape and transport personnel by the overhead manned equipment.From the production-transport management point of view,this is high in productivity and efficiency,little transpor-tation accident,low cost and so on.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []