Dual-purpose quick wiring of three-phase electric energy meter test table skeleton

2015 
The utility model relates to a quick termination is used in the electric energy meter test, concretely relates to dual-purpose quick wiring of three-phase electric energy meter test table skeleton, including the test panel to and the electric current wiring crimping handle, electric current binding post module and the voltage pulse that are located on the test panel assist terminal module, its characterized in that: electric current wiring crimping handle with the electric energy meter crimping on the electric current binding post module, the supplementary terminal module of voltage pulse include the supplementary signal terminal of voltage binding post and pulse, the supplementary signal terminal of voltage binding post and pulse installs in voltage pulse auxiliary signal installation piece, assists the signal terminal crimping through signal terminal crimping handle on the corresponding test terminal of electric energy meter with supplementary signal terminal terminal module 0 messenger voltage binding post of voltage pulse and pulse. The beneficial effects of the utility model are that, based on the utility model discloses a three-phase electric energy meter table skeleton simple structure that works a telephone switchboard fast, the stable performance is reliable, and easy operation is convenient, has saved and has connect the clearing time, has improved plant operation efficiency, can effectively improve work efficiency, the utility model discloses can the wide application on three-phase electric energy meter calibrating installation.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []