Development of a full-size divertor cassette prototype for ITER

1996 
Production of a full-size divertor cassette involves eight major components. All of the components are mounted on the cassette body. Inner divertor channel components for the vertical target design are being provided by the Japan Home Team. Outer divertor channel components for the vertical target design are being provided by the European and United States Home Teams. Gas box liners are being provided by the Russian Home Team. The full-size components manufactured by the four parties will be shipped to the US Home Team for assembly into a full size divertor cassette. The techniques for assembly and maintenance of the cassette will be demonstrated during this process. The assembled cassette will be tested for proper flow distribution and proof of the filling and draining procedures. The testing will include vacuum leak tightness at full temperature and pressure, cyclic heating to 150 {degrees}C, verification of dimensional accuracy of the assembled components, and application of thermal gradients to measure dimensional stability. The development of the divertor for the International Thermonuclear Experimental Reactor (ITER) depends on successful R&D efforts on materials, joining, and plasma materials interactions. Results of the development program are presented. The scale-up of the processes developed in the basic research and development tasks is accomplished by producing and high-heat-flux testing medium and full-scale mock- ups. The design of the mock-ups is discussed.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    2
    Citations
    NaN
    KQI
    []