Feasibility Study of a Neutron Time Of Flight Facility at the CERN-PS

1999 
This report summarises the feasibility study of a neutron time-of-flight facility at the CERN-PS as described in Refs. [1] and [2]. The idea is to extract at 24 GeV/cproton bunches (r.m.s. length ~7 ns) on to a target. The neutrons produced by spallation are directed to an experimental area located 230 m downstream throughout a vacuum pipe (diameter ~80 cm) making use of the existing TT2A tunnel about 7 m below the ISR tunnel.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    1
    References
    0
    Citations
    NaN
    KQI
    []