Accelerator Implementing Development of Ceramics Chamber with Integrated Pulsed Magnet for Beam Test

2019 
We advance the development of Ceramics Chamber Integrated Pulsed Magnet (CCIPM) of air-core type as the application to low emittance ring with a narrow bore of light source accelerator in the future. The CCIPM is composed of ceramics cylinder of 60 mm diameter and four copper coils, which are implanted in the groove penetrated on the ceramic thickness along 30 cm length by silver brazing*. In addition to this structure, we succeeded in the implementations of cable connecting base that mechanically connect the coils and power supply with feeder lines and the pattern shape coating inside the ceramic cylinder. Improved brazing technique made it possible to braze the coil and the base on the coil at the same time that the coils are implanted in the ceramic thickness. Newly developed functional coating can reduce the eddy current caused by main magnetic field and pass the alternate component of beam wall current by capacitance structure. We report the details about the performance from the viewpoint of vacuum, magnetic field, insulation on the accelerator implementation with the approach to new technical development, and the preparation progress of beam test in beam-transport line.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []