Analysis of Precise Position Surveying Method for Cable Pipe of High Tower of Large Cable Stayed Bridge

2007 
Based on the precise positioning experience for cable pipe of high tower of the Fourth Bridge in Xiangtan, this paper discusses the positioning methods, presents three dimensions setting principle on polar axes, precision and data process methods. The practice shows the effectiveness of these methods and the precision can be guaranteed.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []