Upgrading of the synchrotron radiation beam stabilization system of the VEPP-3 storage ring

2015 
The basic components of a new system of stabilization of synchrotron radiation beams of the VEPP-3 storage ring are developed and tested. This system will ensure the beam position measurement and its stabilization not only over the vertical but also over the horizontal angle and coordinate. It will be also possible to use this system in parallel to the previously developed stabilization system, which registers only the vertical components.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    1
    Citations
    NaN
    KQI
    []