This study presents an overview of the results obtained during the first year of the SmartNet project, which aims at comparing possible architectures for optimised interaction between transmission system operator (TSOs) and distribution system operator (DSOs), including exchange of information for monitoring as well as acquisition of ancillary services (reserve and balancing, voltage regulation, congestion management), both for local needs and for the entire power system. The results concerning TSO–DSO coordination schemes, market design and information and communication technology (ICT) architectures are shown along with the layout of the three technological pilot projects.