Instrument accuracy in reactor vessel inventory tracking systems
1986
Instrumentation needs for detection of inadequate core cooling. Studies of the Three Mile Island accident identified the need for additional instrumentation to detect inadequate core cooling (ICC) in nuclear power plants. Industry studies by plant owners and reactor vendors supported the conclusion that improvements were needed to help operators diagnose the approach to or existence of ICC as well as to provide more complete information for operator control of safety injection flow to minimize the consequences of such an accident. In 1980, the US Nuclear Regulatory Commission (NRC) required further studies by the industry and described ICC instrumentation design requirements that included human factors and environmental considerations. On December 10, 1982, NRC issued to Babcock and Wilcox (B and W) licensees orders for Modification of License and transmitted to pressurized water reactor licensees Generic Letter 82-28 to inform them of the revised NRC requirements. The instrumentation requirements include upgraded subcooling margin monitors (SMM), upgraded core exit thermocouples (CET), and installation of a reactor coolant inventory tracking system. NRC Regulatory Guide 1.97, which covers accident monitoring instrumentation, was revised (Rev. 3) to be consistent with the requirements of item II.F.2 of NUREG-0737.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
4
Citations
NaN
KQI