The electrical demand growth and the increasing opposition to new overhead lines is generating important delays in new substations energization, a worse electrical reliability and avoiding new connections in time. A new solution is to install new cables working in a high temperature (also called "low sag"), guaranteeing more than 80% incapacity (but increasing losses), with a high profitability due to this possibility of using the stablished rights-of-way and poles, including an overcost of manpower subcontracted.