강관압입후 슬롯 홀을 갖는 비개착 터널공법의 현장적용에 관한 연구

2015 
In the study, a new non-open cut tunnel steel pipe method using slot hole has been developed. As is overcomes shortcomings of conventional methods, it is applied to the field. The main concept of the new method is the steel pipe pumping system with slot holes which, by means of formation slot holes between each steel pipe, applied to the magnitude of the relaxed earth pressure caused by excavation to the ground to prevent ground displacement. The stability of the support members and effect of displacement control of the new method were verified through several ways as numerical analysis and site test. The new method was applied to the construction of a11.5m wide, 7.4m high and 50m long section that passes side subway and large buildings in inner city. By applying the new method, tunnel construction was successfully completed in 6 months. It decreases the construction period to 30% compared to that of conventional methods, and ground was almost negligible
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []