Test study on joint energy dissipater at Cambodia Stung Atay First Step Hydroelectric Station

2010 
This text introduce the process of experimental staudy on hydraulic model in Cambodia stung atay first hydroelectric station,Through repetitive experimental rvision of original design,a better joint energy dissipater scheme of flaring gate pier and plunge pool and hydraulic jump bucket can solove the problem of energy dissipation and erosion control,this scheme economize the project amount and adopted by the station.