Performance Analysis of the European XFEL SRF Cavities, From Vertical Test to Operation in Modules

2017 
More than 800 resonators have been fabricated, vertically qualified and operated in module tests before the accelerating module installation in the linac, which will be completed before the conference. An analysis of this experience, with correlation of the final cavity performances with production, preparation and assembly stages, is underway and at the time of the conference a summary of the activities will be available.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    9
    References
    1
    Citations
    NaN
    KQI
    []