The invention discloses a closed origin and arrival construction method of a shield machine, comprising the following steps: (1) using a tight continuous wall enclosure structure as a plain concrete continuous wall; (2) opening slanting periphery observation holes on a cavity door to observe the stable and leak conditions of soil bodies; (3) chiseling concrete and steel bars on the cavity door sectionally, and using plain concrete to replace the original continuous wall synchronously; (4) installing a receiving device of the shield machine, and applying pre-applied force; (5) filling materials in a steel sleeve barrel of the receiving device to a request height; (6) testing the pressure resistance of the steel sleeve barrel; (7) carrying out the digging construction of the shield machine until a shield tail of the shield machine enters or separates the cavity door; and (8) decompressing and disassembling the steel sleeve barrel of the receiving device. The closed origin and arrival construction method of the shield machine is safe, economical, efficient and simple, changes uncontrollable factors into controllable factors in a shield origin and arrival process, greatly reduces risks in a construction process, better controls land subsidence and provides the effectively ensured closed origin and arrival construction method of the shield machine.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []