Correcting method for high speed railway ballastless track subgrade in soft soil area

2014 
The invention discloses a correcting method for high speed railway ballastless track subgrade in a soft soil area. The correcting method comprises the following steps that 1, when the lateral displacement of the high speed railway embankment occurs , a deformation groove and a plurality of stress relief apertures are formed in an asymmetrical load region, the deformation groove is filled with rigid foam, and the stress relief apertures are filled with grits and rubbles; 2, a first row jet-grouting pile is arranged in a second soft stratum area, the instantaneous injection pressure generated by the construction of the first row jet-grouting pile is utilized to drive a pile foundation reinforcement area located at the bottom of the high speed railway embankment to conduct the displacement from the second soft stratum area to a first soft stratum area, the pile foundation reinforcement area drives a subgrade reinforcement bed course located above the pile foundation reinforcement area and the high speed railway embankment to move simultaneously, and the correcting for the high speed railway subgrade is achieved; 3, the deformation groove is densely filled with the rubbles plus 5% of cement. An acting force is applied on subgrade deeps, the subgrade drives the subgrade body to conduct a movement, so that the purpose of correcting the lateral displacement of the subgrade is achieved.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []