Allowable Delay Heuristic in Provision of Primary Frequency Reserve in the Future Power System

2019 
With the reduction in available inertial reserve and increasing penetration of inverter-interfaced generators, traditional allowable delay in the provision of the primary frequency reserve will threaten the security of the future grid. However, droop control with fast-enough inertia-less generators can limit the post-contingency frequency excursion. To conform with the fast-enough reserve provision in a reduced and varying-inertia system, an economical clearing of the reserve requires an allowable delay heuristic corresponding to the desired system frequency excursion characteristic while alleviating the causality dilemma introduced by the unavailability of maximum delay heuristic before clearing. The proposed heuristic establishes a relationship among the system parameters, such as the aggregated system inertia, regulation factor, system frequency, desired frequency response, and allowable delay margin. The Pade approximation technique is utilized for deriving the transfer function of such system, allowing calculation of the allowable delay with various damping ratios corresponding to the dominant poles. The impact of different Pade order on the determined heuristic is analyzed. The regulation factor of the generators is calculated based on the reserve bid volume to ensure proportional injection during contingencies. The impact of regulation factor, and associated delay, on the frequency response, is also studied.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    32
    References
    5
    Citations
    NaN
    KQI
    []