Study on Underpinning Scheme of Viaduct Pile Foundation Crossed by Shield Tunnel

2020 
Rapid developments in domestic metro construction could inevitably result in cross-engineering conflicts between metro lines and existing bridge pile foundations. Pile underpinning technology has been successfully applied to such projects to ensure the operating safety of viaducts and synchronous construction of metro lines. One section tunnel of Jinan Metro Line R2 is selected as the research object in this study. First, the processes of pile underpinning and tunnel crossing construction are numerically simulated using finite element software. Next, the deformation law of underpinning structures is studied and the engineering risk points are determined. Finally, the design scheme of pile underpinning is proven to be correct and reasonable. The results are as follows: (1) The underpinning structure presents a trend of overall settlement. The horizontal displacement of the pile body occurs in the form of a bow. Maximum deformation occurs at the underpinning beam and top of the pile. (2) The influence area of the soil surface is approximately 4 m outside the underpinning beam, and the deformation values of the underpinning system meet construction requirements. (3) The following construction steps are recommended. Step 1: Pre-jacking constructing. Step 2: Pile cutting. Step 3: Jack removal and underpinning beam and pile cap construction. Step 4: Road surface backfilling and repair. The shield machine should then be allowed to pass. (4) This paper provides targeted risk management measures. For example, isolation piles should be set on both sides of the tunnel.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    1
    References
    0
    Citations
    NaN
    KQI
    []