Initial Experience, Safety, and Feasibility of Left Bundle Branch Area Pacing

2020 
Abstract Objectives This study sought to evaluate the safety and feasibility of conduction system pacing by performing left bundle branch area pacing (LBBAP). Background There are limited data from...
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []