운영효율을 고려한 모노레일 차량기지 설계 사례

2009 
As cities have expanded, public transportation systems are focused on city urban railroad. However, subway is no more attractive due to its high construction cost. As a result, a new system - LRT(Light Rail Transit) is presented as an alternative system. One of the LRT - monorail system has been chosen by Daegu Metropolitan City Government for the urban railroad line 3, owing to its low construction cost and positive effect for city scopes. But monorail system has a complex problem on wiring, turn-out system. So engineers who design to apply monorail depot have to check into these matter. This paper introduces overseas cases of monorail depot for reference, outline of the planning structure in depot, go out depot line plan related to manless operating and result of simulation on depot operation. We hope this contents are helpful for engineers who are interested in the monorail depot.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []