FIRST FEASIBILITY STUDY FOR EXL WITH PROTOTYPE DETECTORS AT THE ESR AND DETECTOR SIMULATIONS

2009 
This contribution presents some results from the first feasibility measurement performed at GSI using a 350 MeV/nucleon 136Xe beam and a Hydrogen gas-jet target. In this feasibility study, one element of every possible detection part of the future EXL detection system was investigated. In addition, simulation results for EXL setup will be presented.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    20
    Citations
    NaN
    KQI
    []