Development of 1st ITER Gyrotron in QST

2019 
This paper presents a summary of recent progress pertaining to the manufacturing and inspection of ITER gyrotrons and the operation system in QST. Major achievements are as follows. (i) The final design of the ITER gyrotron was accomplished and manufacturing of two ITER gyrotrons was completed. Then operation test in QST prior the shipment to ITER has started with ITER relevant high voltage power supply configuration. The 1st ITER gyrotron has achieved 1.05 MW operation for 300 s with 51% efficiency. Measured cooling channel waveform of 300 s pulse demonstrated thermally stable condition representing sufficient cooling performance for 1 MW CW operation; (ii) 5kHz modulation operation was demonstrated up to 200 s at with agt;0.8 MW at flat top of pulses; (iii) 300 s / 1 MW operation was repeated for 20 shots with successful 19 shots which demonstrating agt;95% of reliability requirement. These results lead to success of ITER EC HaCD system construction and commissioning toward first plasma.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    18
    References
    4
    Citations
    NaN
    KQI
    []