Optimization Research on Offshore Integral Lifting Project for Large Deck

2015 
The basic technical problems faced in the integral lifting scheme selection of large deck are briefly introduced.This work is based on the project design of offshore installation of 28- 2 wellhead platform in Bozhong south oilfield.The detail methods and computational formulas applying for the scheme selection of deck lifting are summarized,and a sensitivity analysis for integral lifting parameter is carried out.