FIELD DEMONSTRATION OF A MEMBRANE PROCESS TO SEPARATE NITROGEN FROM NATURAL GAS
2003
The original proposal described the construction and operation of a 1 MMscfd treatment system to be operated at a Butcher Energy gas field in Ohio. The gas produced at this field contained 17% nitrogen. During precommissioning of the project, a series of well tests showed that the amount of gas in the field was significantly smaller than expected and that the nitrogen content of the wells was very high (25 to 30%). After evaluating the revised cost of the project, Butcher Energy decided that the plant would not be economical and withdrew from the project. Since that time, Membrane Technology and Research, Inc. (MTR) has signed a marketing and sales partnership with ABB Lummus Global, a large multinational corporation. MTR will be working with their Randall Gas Technology group, a supplier of equipment and processing technology to the natural gas industry. Randall's Engineering group has found a new site for the project at a Duke Energy gas processing plant in Milfay, Oklahoma.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI