Design of Modified Winch System for The NMITLI 500 kw wind turbine system

2011 
The report details the design considerations involved in the winch system of the CSIR-NMITLI 500 kw wind turbine system commissioned at Kethanur, Coimbatore, Tamilnadu. There are five important parts of the winch system the wire rope, rope drum/shaft gear box & motor, bearing housing (Plummer block) and after modifications) used to implement the non-crane solution for the lifting and lowering of the tilt type turbine tower
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []