Cost-Benefit Analysis for Determination of the Time to Implement In-line Inspection(ILI) on High Pressure Urban Gas Pipelines

2011 
Cost-benefit analysis (CBA) has been performed in order to decide whether the ILI (in-line inspection) suggested as risk mitigation measure (RMM) from quantitative risk assessment is reasonably practicable. As a result of CBA, we could find out the reasonable intervals of implementation of ILI. In order to assess the benefit, value of preventing a fatality (VPF), which measures value of human life, has been used. The adequate VPF figure of high pressure urban gas pipelines for CBA used in this paper is two billion won. As a result of 2 case studies, we found that the most reasonable intervals of ILI suggested as RMM were 13 years or 15 years.