WAVI-VSP: Reducing Drilling Risk
2019
Summary Critical to the successful delivery of ultra-HPHT production wells on the Culzean gas development project has been the placement of the production liner. To ensure correct depth of the liner a combination of GeoWave II® and the look-ahead Walkalong Vertical Incidence VSP (WAVI-VSP) technique have been deployed. Underpinning this has been detailed planning and close collaboration between operator and contractor.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI