Installation construction method for curtain wall with hyperbolic metal veneer

2014 
The invention provides an installation construction method for a curtain wall with a hyperbolic metal veneer. The method includes the steps of conducting measuring and paying off while setting up a three-dimensional model diagram, determining the size of unit plates, manufacturing and installing a special-shaped bearing truss, conducting overall adjustment on a transverse horizontal keel while installing the transverse horizontal keel, installing and positioning the metal hyperbolic veneer, then, installing a metal veneer, adjusting the veneers, and finally conducting quality acceptance. The key technologies such as the technology of manufacturing of the special-shaped bearing truss and the technology of overall adjustment of the transverse horizontal keel are adopted, construction is accurately, safely and effectively completed, the cost performance is good, the curtain wall is easy to maintain and long in service life, and the method is mainly suitable for construction of the curtain wall with the metal hyperbolic veneer and particularly suitable for installation construction of the engineering veneer of the hyperboloid structure.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []