Acceptance test procedure for the MO-293 (1722) 10-wide mobile office

1994 
This Acceptance Test Procedure has been prepared to demonstrate that the Fire Protection System functions as required by project criteria. The test results will be issued as an acceptance test report after all the testing is complete. This facility is part of the Spent Nuclear Fuel Project. An appendix is provided as a checklist of activities to be performed by the fire alarm system installer to ensure proper installation and operation.