Pipe pile leading-hole construction method under boulder cluster geological condition

2013 
The invention relates to a pipe pile construction method, in particular to a pipe pile leading-hole construction method under the boulder cluster geological condition. The pipe pile leading-hole construction method adopts a down-hole hammer drilling process, and dilled muck is forcibly discharged out through a spiral drill rod in a rotation mode and is completely removed by utilizing strong wind. The down-hole hammer drilling hole bottom is cleaned through air pressure for 2-3minutes and sediments are removed with lifting of the spiral drill rod after the depth of a drill hole reaches to the designed depth, and operation is stopped after detection shows that the hole depth and the sediment thickness are smaller than or equal to 50mm and meet the design requirements. When the sediment thickness is larger than 50mm, a down-hole hammer is put into the hole again to perform secondary hole cleaning till the actual requirement is met. The pipe pile leading-hole construction method under the boulder cluster geological condition is short in construction period, the construction cost can be saved by more than 10% under the same operating conditions, a stratum application range is wide, and the pipe pile leading-hole construction method is especially suitable for construction of landslide, instability and other complicated stratums. The pipe pile leading-hole construction method is strong in machine tool selectivity and low in field requirement and is especially suitable for mountains and other narrow and small fields.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []