DESIGN OF A 2.2 GEV ACCUMULATOR AND COMPRESSOR FOR A NEUTRINO FACTORY
2000
The proton driver for a neutrino factory must provide megawatts of beam power at a few GeV, with nanosecond long bunches each containing more than 1 × 10 12 protons. Such beam powers are within reach of a high-energy linac, but the required time structure cannot be provided without accumulation and compression. The option of a linacbased 2.2 GeV proton driver has been studied at CERN, taking into account the space charge and stability problems which make beam accumulation and bunch compression difficult at such a low-energy. A solution featuring two rings of approximately 1 km circumference has been worked out and is described in this paper. The subjects deserving further investigation are outlined.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
6
References
17
Citations
NaN
KQI