Organization of staged evaporation in a steam generator installation at an NPS with a VVER-1000 reactor

2001 
The advisability of connecting the steam generators (SG) of the steam generator installation at an NPS with a VVER-1000 reactor in accordance with the scheme of staged evaporation with a transfer pump is substantiated. The greatest effect can be obtained in designing this installation by the selection of the steam output and the design of the steam generator of evaporation stage II.
    • Correction
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []