Inspection of JMTR secondary cooling system. Secondary cooling system piping and cooling tower

2010 
JMTR secondary cooling system piping and a cooling tower were inspected from the view point of long term utilization before the renewal work for the secondary cooling system of the JMTR on FY 2008. As the result, it was confirmed that crack, swelling, and exfoliations in inner of piping lining, and decay and dryness of wood in the upper part of the cooling tower. From the result of this inspection some facilities and machinery were repaired or replaced from the view point of preventive maintenance. (author)
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []