Quantitative controlling approach of time synchronicity in convergent supply processes

2016 
Controlling the time synchronicity of supply processes for assembly requires a quantitative measure. An existing controlling instrument, the supply diagram, already provides an effective way of assessing the supply situation. It incorporates different key figures which allow for an evaluation of a company’s supply process coordination. However, it lacks a key figure for describing the level of time synchronicity. Therefore, a quantitative evaluation of actions to improve the time synchronicity in supply processes is not possible. Based on an existing approach of approximating the completion of full assembly orders, a key figure for describing the level of time synchronicity is developed in this article: the synchronicity factor. As this new key figure is dependent on the average number of components required for one assembly order for the regarded time period, a second measure, the relative synchronicity factor, accounts for this number and can thereby be used to compare different time periods. As the numerical calculation of the synchronicity factors is a complex problem, the possibility of applying a simple hill climbing algorithm to accurately determine the synchronicity factor for a certain supply situation is examined.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    18
    References
    1
    Citations
    NaN
    KQI
    []