Total productive maintenance on example of automated foundry lines

2009 
Within framework of the presented study one has performed analysis of stoppages in automatic foundry lines operation, and basing on assumptions from complex maintenance system has undertaken himself to develop a service maintenance schedule for machinery installed in the line. Moreover, one has presented general assumptions of TPM system operated in conditions of series and multi-series production of cast iron castings. One has constructed operational database and has elaborated a list of line stoppage causes within a year. One has proposed a possibility of implementation of manufacturing systems modeling and simulating technique in management of production machinery operation in a foundry shop. Within framework of the simulation experiment one has developed schedules of production, schedules of maintenance and has forecasted indices of general productivity of the machinery for a various scenarios of events on example of casting line having in-series structure of operational reliability. In course of the study there was implemented ARENA universal software package to modeling and simulation of the manufacturing systems.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    11
    References
    6
    Citations
    NaN
    KQI
    []