Integrated leak rate testing of the fast flux test facility reactor containment building

1978 
The initial Integrated Leak Rate Test (ILRT) of the Fast Flux Test Facility containment building was performed from May 27 to June 2, 1978. The test was conducted in air with systems vented and with the containment recirculating coolers in operation. 10 psig and 5 psig tests were run using the absolute pressure test method. The measured leakage rates were .033% Vol/24 hr. and -.0015% Vol/24 hrs. respectively. Subsequent verification tests at both 10 psig and 5 psig proved that the test equipment was operating properly and it was sensitive enough to detect leaks at low pressures. This ILRT was performed at a lower pressure than any previous ILRT on a reactor containment structure in the United States. While the initial design requirements for ice condenser containments called for a part pressure test at 6 psig, the tests were waived due to the apparent statistical problems of data analysis and the repeatability of the data itself at such low pressure. In contrast to this belief, both the 5 and 10 psig ILRT's were performed in a successful manner at FFTF.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []