Integrated piloting of a thermophilic bioleaching process for the treatment of a low-grade nickel-copper sulphide concentrate

2009 
recovery. This paper describes the use of thermophilic bioleaching for the recovery of nickel and copper from a low-grade nickel-copper concentrate produced at the Aguablanca Mine in southern Spain. Currently, the Aguablanca Mine produces a bulk nickel-copper concentrate for sale to a smelter, and the proposition is to increase the profitability of the operation by the on-site production of metal or metal intermediate. Initially, bench-scale bioleach tests were conducted to determine the bioleach operating conditions. These tests included an evaluation of mesophilic, moderately thermophilic and thermophilic microorganisms. In order to achieve sufficiently high levels of both copper and nickel extraction, a thermophilic process was selected— this was necessary for leaching of the refractory chalcopyrite that occurs in this concentrate. Additional bench-scale test work was carried out to derive a conceptual process flowsheet for the solution purification and metals recovery circuit. The results of the bench-scale tests were used to design, construct and commission an integrated pilot plant, which was subsequently operated at Mintek for over seven months. During this time, the solution purification and metals recovery processes were optimized, and all recycle loops were closed. The final process flowsheet included the following unit operations: concentrate regrinding, thermophilic bioleaching at 70°C, primary iron removal using limestone, copper solvent extraction and electrowinning, secondary iron removal, nickel hydroxide precipitation using magnesia, and final solution purification using lime. Where applicable, process solutions were recycled to preserve water. The process design data derived from this pilot-plant campaign formed the basis for a conceptual engineering study for the developed process. In the study, mass and energy balances were derived, and a process flowsheet was developed and used as the basis for estimating the capital and operating costs of the process. This enabled a preliminary economic analysis of the process to be undertaken. The findings of this study are discussed.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    6
    References
    12
    Citations
    NaN
    KQI
    []