Development of Integrated Production Scheduling System in the Process Industry

2005 
This study introduces a three-level hierarchical production planning and scheduling approach developed and implemented in a resin factory. Our approach proposes at the first level a mixed-integer linear programming for solving the aggregate planning model. At the second level, a weighted-integer goal-programming model is developed to disaggregate the developed aggregate plans. A sequencing algorithm is developed for the third level that tends to minimize the total weighted tardiness. Real industrial data is used to test and validate the proposed models.