Design of Long Span Half-Through Concrete Filled Steel Tube Arch Bridge

2007 
Taking the 4th Binhai Road Bridge in the Development Zone of Dalian City as an example,this paper presents the key points of the overall design,plane and spatial static analysis,stability analysis and construction technology of long span half-through concrete-filled steel tube arch bridge.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []