Exoplanet direct imaging: coronagraph probe mission study “EXO-C”

2013 
• Build on previous work (ACCESS, PECO, ...) • Begin with science goals and trade studies of system-level issues: telescope design, orbit selection, pointing control, wavefront stability and control, cost • Evaluate coronagraph options in the context of achievable system performance • Engage Aerospace Corp. early in the study for cost feedback • Innovate
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    4
    Citations
    NaN
    KQI
    []