Fabrication of the L-3 L6200 multi-beam IOT for ESS

2016 
L-3 Communications Electron Devices (L-3 EDD) is developing a high power Multi-beam IOT (MBIOT) for the European Spallation Source (ESS). Extensive simulation work has been completed and, where possible, results were validated against experiment using a scaled single-beam prototype. The MBIOT design has been finalized; fabrication of the tube is in progress, and configuration of a factory test bay is underway.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    0
    Citations
    NaN
    KQI
    []