Long-term optimal operation of series parallel reservoirs for critical period with specified monthly generation and average monthly storage
1989
We present in this paper an efficient approach for solving the problem of planning the long-term (multiyear) operation of a multireservoir hydroelectric power system for the critical period with a monthly variable load. This load is equal to a certain percentage of the total generation at the end of the year, subject to satisfying a number of constraints on the hydrosystem, using the minimum norm formulation.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
14
References
1
Citations
NaN
KQI