A note on “On three-machine flow shop scheduling with deteriorating jobs”

2017 
Abstract In the recent paper (L. Wang, L.Y. Sun, L.H. Sun, J.B. Wang, On three-machine flow shop scheduling with deteriorating jobs, International Journal of Production Economics 2010, 125, 185–189), a branch and bound algorithm with several dominance properties were presented. In this note, we point out by means of a counter-example that the proposed dominance properties are incorrect and then, we will provide the correct dominance properties.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    8
    References
    4
    Citations
    NaN
    KQI
    []