High flux isotope reactor. Quarterly report, October, November, and December 1981

1982 
Routine reactor operation with four end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 90.9% for the quarter. The outer control plates and the inner control cylinder were changed, the removable and semi-permanent reflectors were replaced, and a semiannual core component inspection was made.