Multi-objective integrated production planning model and simulation constrained doubly by resources and materials
2014
Based on analysing the defects of ERP planning system and researching related literatures, a multi objective integrated production planning model is constructed which is constrained double by resources and materials. The model tekes delivery on-tome, reduces inventory , reduces overtime work, meintains safety inventory as its optimization objectives, and can achieve the integrated optimization method provided by the model has strong feasibility and effectness.
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
14
References
4
Citations
NaN
KQI