Current Status of Phase II Investigations: Mizunami Underground Research Laboratory (MIU) Project

2009 
The Mizunami Underground Research Laboratory (MIU) Project, a comprehensive research project investigating the deep underground environment in crystalline rock, is being conducted by the Japan Atomic Energy Agency at Mizunami City, Central Japan. The MIU Project is being carried out in three overlapping phases: Surface-based Investigation (Phase I), Construction (Phase II), and Operation (Phase III), with a total duration of 20 years. The overall project goals of the MIU Project from Phase I through to Phase III are: 1) to establish techniques for investigation, analysis and assessment of the deep geological environment, and 2) to develop a range of engineering techniques for deep underground application. Phase I was completed in March 2004, and Phase II investigations associated with the construction of the underground facilities are currently underway. Phase II investigation goals are to evaluate the geological, hydrogeological, hydrogeochemical and rock mechanical models developed in Phase I and to assess changes in the deep geological environment caused by the construction of underground facilities. Geological mapping, borehole investigations for geological, hydrogeological, hydrochemical and rock mechanical studies are being carried out in shafts and research galleries in order to evaluate the models. Long-term monitoring of changes in groundwater chemistry and pressure associated with the construction of the underground facilities continue in and around the MIU site, using existing boreholes and monitoring systems. This report summarizes the current status of the MIU Project on results of the Phase II investigations to date.Copyright © 2009 by ASME
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []