Economic Operation of Large Hydrothermal Power Systems

1980 
Abstract In this paper an approach is proposed to rationalize the operation of large energy production systems, over periods where the independent water inflows and load demands can be well known. A precise model is considered to represent the hydraulic system:individua1ised reservoirs in cascade, water transportation delays, non1inear generations, etc… The non hydraulic production (usual thermal generation, interchange,…) includes load shedding. Difficulties resulting from the large scale are overcomed by decomposition techniques.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    9
    References
    0
    Citations
    NaN
    KQI
    []