Production process of corrosion-resistance prefabricated assembled reinforced concrete inspection well
2016
The invention discloses a production process of a corrosion-resistance prefabricated assembled reinforced concrete inspection well. The production process comprises the following steps: (S1) inner and outer molds of a prefabricated corrosion-resistance concrete inspection well are cleaned; (S2) a demolding agent is brushed on the cleaned inner and outer molds in the step (S1); (S3) firstly, the corrosion-resistance machining is performed for reinforcements needed to manufacture corrosion-resistance concrete; the reinforcements are brushed with polyurethane and graphene mixed coating layers; the thickness of the mixed coating layers is 100-500 nm; the weight mixing ratio of polyurethane to graphene is 3: 1-10: 1; the multiple reinforcements brushed with the polyurethane and graphene mixed coating layers are bound as a reinforcement skeleton; and meanwhile, each node of the reinforcement skeleton is brushed with the polyurethane and graphene mixed coating layers. From two aspects of the component materials of the corrosion-resistance concrete and brushing of a zinc alloy coating layer on the surface of the corrosion-resistance concrete, the corrosion resistance of the prefabricated assembled reinforced concrete inspection well is improved, so that the durability of the prefabricated assembled reinforced concrete inspection well is greatly enhanced.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI