Utilization of Waste Heat for Pre-heating of Anodes
2020
Carbon anodes are replaced on a regular basis in Hall–Heroult cells as they are consumed by electrochemical reactions. Upon insertion of new anodes, bath will freeze locally as a result of low bath superheat and comparatively low anode temperature, creating an insulating layer on the anode surface, thereby delaying further production. In the current work the potential for pre-heating anodes directly utilizing waste heat from off-gas and spent anode butts is investigated using a numerical model realized in COMSOL and industrial measurements at the Alcoa Mosjoen smelter. Anode core temperatures over 150 \(^{\circ }\)C and surface temperatures over 250 \(^{\circ }\)C were found when using butts as a direct heat source. Frozen bath samples from both pre-heated and regular anodes were collected and analysed using computer tomography (CT) in order to assess how various heating strategies influences frozen bath morphology.
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
8
References
1
Citations
NaN
KQI