Sistem Monitoring Perpindahan Panas padaWater Cooling Tank FASSIP-02 BerbasisLabView

2018 
Abstrak—Sistem Monitoring Perpindahan Panas Pada Water Cooling Tank Fassip-02 Berbasis Labview. Dalam rangka kegiatan INSINAS Kemenristekdikti tahun 2017 di labolatorium fasilitas termohidrolika PTKRN BATAN dibangun fasilitassimulasi pendingin pasif teras reaktor ketika terjadi station blackout. Fasilitas tersebut diberi nama Fasilitas Simulasi Sistem Pasif versi ke dua (FASSIP-02). Pada FASSIP-02 terdapat fasilitas water cooling tank. Fungsi water cooling tankuntuk mengkondisikan temperatur bagian pendingin FASSIP-02. Pada kegiatan inidilakukan pembuatan sistem monitoring perpindahan panas water cooling tank pada FASSIP-02 berbasis Labviewyang terdiri dariinput laju aliran massa air, kalor spesifik fluida dan perbedaan temperatur. Tujuan kegiatan ini adalah membuat sistem monitoring perpindahan panas pada WCT FASSIP-02 yang dapat memonitoring, mengolah dan menyimpan data secara komputerisasi secara realtime. Untuk perangkat keras sistem monitoring perpindahan panas pada water cooling tank FASSIP-02 berbasis labview menggunakan modul akuisisi data National InstrumentCDAQ 9178 dan modul termokopel National Instrument 9213. Untuk perangkat lunaknya menggunakan Labview kemudian perangkat keras dikoneksikan dengan komputer dan perangkat lunak yang telah dibuat dengan Labview. Hasil dari pembuatan program sistem monitoring perpindahan panas pada water cooling tank FASSIP-02 berbasis labview adalah dapat menampilkan dan merekam perhitungan perpindahan panas water cooling tank FASSIP-02. Kata kunci : Perpindahan panas, Water cooling tank, FASSIP-02, Labview Abstract—Monitoring System Of Heat Transfer In Water Cooling Tank Fassip-02 Based Labview. In the framework of INSINAS Kemenristekdikti activities in 2017 at the laboratory of PTKRN BATAN thermohydraulic facility will be built simulation for passive core cooling of thereactor core when it occurs blackout station. The facility is named Second Passive System Simulation Facility (FASSIP-02). At FASSIP-02 there is a water cooling tank facility. Water cooling tank function to condition the cooling temperature of FASSIP-02. In this activity a water cooling tank heat transfer monitoring system was performed on a Labview based FASSIP-02 consist of input water mass flow rate, specific heat offluids and temperature difference. The purpose of this activity is to create a heat transfer monitoring system on WCT FASSIP-02 that can monitor, process and store data in computerized realtime. For hardware of monitoring system of heat transfer in water cooling tank based Labview using national instrument CDAQ 9178 and 9213 thermocouple module. For software use labview the hardware connected to computer and software that has been made with Labview. The results of the program of heat transfer monitoring system on FASSIP-02 water cooling tank based on labview is able to display and record the calculation of heat transfer tank FASSIP-02. Keyword: Heat transfer, Water cooling tank, FASSIP-02, Labview
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []